Machinery diagnostics references

Diagnostics references Diagnostics references
1.     Analysis of INA Petrokemija Kutina, Croatia Ammonia - 2 and Urea Plant turbomachinery vibrational and mechanical condition during steady state operation and shutdown before overhaul TC21101+C21101LP+HP + SM21101, TC 21102+C21102LP+HP, TC21103+C1103LP+HP, TC21105 + C21105LP+HP and T22112 + C22112LP +SM22112 + C22112HP) - 17 machines1994
2.     Analysis of INA Petrokemija Kutina, Croatia Ammonia - 2 and Urea Plant turbomachinery vibrational and mechanical condition during startup and steady operation after overhaul (TC21101+C21101LP+HP+SM21101, TC 21102+C21102LP+HP, TC21103+C1103LP+HP, TC21105 + C21105LP+HP and T22112 + C22112LP +SM22112 + C22112HP) - 17 machines1994
3.     Analysis of INA Petrokemija Kutina, Croatia TP 21153 turbine and P 21153 pump vibration behavior and condition1995
4.     Analysis of INA Petrokemija Kutina, Croatia Ammonia - 2 and Urea Plant turbomachinery vibrational and mechanical condition during steady state operation and shutdown before overhaul TC21101+C21101LP+HP + SM21101, TC 21102+C21102LP+HP, TC21103+C1103LP+HP, TC21105 + C21105LP+HP and T22112 + C22112LP +SM22112 + C22112HP) - 17 machines1995
5.     Analysis of INA Petrokemija Kutina, Croatia Ammonia - 2 and UREA plant turbomachines vibration condition included in predictive maintenance program (20 turbines, 14 compressors, 24 pumps, 2 hydro turbines, 3 fans)1995
6.     Analysis of INA Petrokemija Kutina, Croatia Ammonia - 2 and UREA plant turbomachines vibration condition included in predictive maintenance program (20 turbines, 14 compressors, 24 pumps, 2 hydro turbines, 3 fans)1995
7.     Analysis of INA Petrokemija Kutina, Croatia Ammonia - 2 plant turbomachines vbiration condition and behavior during plant startup (TC21101+C21101LP+HP + SM21101, TC21102+C21102LP+HP, TC21103+C1103LP+HP, TC21105+C21105LP+HP1995
8.     Analysis of INA Petrokemija Kutina, Croatia Ammonia - 2 and UREA plant turbomachines vibration condition included in predictive maintenance program (20 turbines, 14 compressors, 24 pumps, 2 hydro turbines, 3 fans) 1995
9.     Analysis of INA Petrokemija Kutina, Croatia Ammonia - 2 and UREA plant turbomachines vibration condition included in predictive maintenance program (20 turbines, 14 compressors, 24 pumps, 2 hydro turbines, 3 fans)1995
10.   Analysis of INA Petrokemija Kutina, Croatia Amonijak - 2 plant sintesys compressor turbotrain TC+C 21103, P 21143,P 21143 A,TP 21143, PM 21143, P 21153,P 21153 A, TP 21153, PM 21153 vibration condition1995
11.   Analysis of INA Petrokemija Kutina, Croatia Ammonia - 2 plant ammonia cooling compressor turbotrain TC+C 21105LP+HP and P 21145,P21145A, TP 21145, PM 211451995
12.   Analysis of vibration condition of turbotrain TB +B21101 in Ammonia- 2 plant of INA Petrokemija Kutina, Croatia1995
13.   Vibration behavior and condition analysis of turbotrain TP + in Ammonia - 2 plant of INA Petrokemija Kutina, Croatia1995
14.   Vibration condtion and behavior analysis of turbotrain TP +P21104A in Ammonia - 2 plant of INA Petrokemija Kutina, Croatia1995
15.   Vibration condition and behavior analysis of turbotrain TB +B 21101 in Ammonia - 2 plant of INA Petrokemija Kutina, Croatia nakon zamjene rotora turbine1995
16.   Analysis of vibration and operational problem of the gearbox SR +P21104 A and turbotrain TP 21104A in Ammonia - 2 plant of INA Petrokemija Kutina, Croatia1995
17.   Vibration condition and behavior analysis of gearbox SR +P21104 A and turbotrain TP 21104A in INA Petrokemija Kutina, Ammonia-2 plant after repair1995
18.   Analysis of INA Petrokemija Kutina, Croatia Ammonia-2 plant hydroturbine THP 21107A vibration condition and behavior1995
19.   Vibration condition and behavior analysis of turbotrain TP +P21107B in Ammonia-2 plant of INA Petrokemija Kutina, Croatia1995
20.   Analysis of vibration condition of turbine, gearbox and pump TP+SR+P 21107B in INA Petrokemija Kutina, Amonijak plant1995
21.   Vibration analysisof condition and behavior of turbine, gearbox and pump TP+SR+P 21107B in INA Petrokemija Kutina, Ammonia-2 plant after turbine and gearbox revision1995
22.   Analysis of vibration behavior and condition of turbine TP 21107B in INA Petrokemija Kutina, Ammonia-2 plant1995
23.   Vibration condition and behavior analysis of Urea plant-2 CO2 compressor turbotrain TC+C 2211LP+HP + SM 221122 in INA Petrokemija Kutina, Croatia1995
24.   Analysis of vibration condition and behavior of Nitric acid 2 turbotrain in INA Petrokemija Kutina, Croatia1995
25.   Vibration condition and behavior analysis of turbotrains TP +P21108A and TP+P 21108B in Ammonia-2 plant of INA Petrokemija Kutina, Croatia1995
26.   Vibration condition and behavior analysis of turbine and gearbox TP+SR 21107B in Ammonia-2 plant of INA Petrokemija Kutina, Croatia after repairs1995
27.   Analysis of vibration condition and behavior of turbine TP 21107B in Ammonia-2 plant of INA Petrokemija Kutina, Croatia1996
28.   Analysis of vibration problem of Woodward governor on turbine TP 21107 A in Ammonia-2 plant of INA Petrokemija Kutina, Croatia1996
29.   Vibration condition and behavior analysis of turbotrain TP +P21107A in Ammonia-2 plant of INA Petrokemija Kutina, Croatia after turbine overhaul1996
30.   Analysis of Nitric Acid turbotrain (steam turbine+axial air compressor+Nitric gases centrifugal compressor + gas expander) vibration condition and behavior, INA Petrokemija Kutina, Croatia1996
31.   Vibration condition and behavior analysis of feed water turbotrain TP +SR 211014A+P21104A in Ammonia-2 plant of INA Petrokemija Kutina, Croatia1996
32.   Analysis of vibration condition ans problem of synthesis gas compressor turbotrain (TC211013+C21103LP+HP) in Ammonia-2 plant of INA Petrokemija Kutina, Croatia1996
33.   Analysis of INA Petrokemija Kutina, Croatia Ammonia - 2 and UREA plant turbomachines vibration condition included in predictive maintenance program (20 turbines, 14 compressors, 24 pumps, 2 hydro turbines, 3 fans) 1996
34.   Analysis of INA Petrokemija Kutina, Croatia Ammonia - 2 and UREA plant turbomachines vibration condition included in predictive maintenance program (20 turbines, 14 compressors, 24 pumps, 2 hydro turbines, 3 fans) 1996
35.   Analysis of INA Petrokemija Kutina, Croatia Ammonia - 2 and UREA plant turbomachines vibration condition included in predictive maintenance program (20 turbines, 14 compressors, 24 pumps, 2 hydro turbines, 3 fans) 1996
36.   Analysis of INA Petrokemija Kutina, Croatia Ammonia - 2 and UREA plant turbomachines vibration condition included in predictive maintenance program (20 turbines, 14 compressors, 24 pumps, 2 hydro turbines, 3 fans) 1996
37.   Analysis of INA Petrokemija Kutina, Croatia Ammonia - 2 and UREA plant turbomachines vibration condition included in predictive maintenance program (20 turbines, 14 compressors, 24 pumps, 2 hydro turbines, 3 fans) 1996
38.   Analysis of INA Petrokemija Kutina, Croatia Ammonia - 2 and UREA plant turbomachines vibration condition included in predictive maintenance program (20 turbines, 14 compressors, 24 pumps, 2 hydro turbines, 3 fans) 1996
39.   Analysis of INA Petrokemija Kutina, Croatia Ammonia - 2 and UREA plant turbomachines vibration condition included in predictive maintenance program (20 turbines, 14 compressors, 24 pumps, 2 hydro turbines, 3 fans) 1996
40.   Analysis of turbotrain TP+SR+P+THP 21107B vibration problem in Ammonia Plant-2 (INA Petrokemija Kutina, Croatia) 1997
41.   Vibration condition and behavior analysis of turbine TP+P+THP 21107A in Ammonia-2 plant of INA Petrokemija Kutina, Croatia during steady state operation1997
42.   Analysis of vibration condition ans problem of synthesis gas compressor turbotrain (TC211013+C21103LP+HP) in Ammonia-2 plant of INA Petrokemija Kutina, Croatia1997
43.   Analysis of Ammonia Plant-2 feed water pump turbotrain (TP+SR+P 21104)vibration condition and behavior (INA-Petrokemija Kutina, Croatia) during steady state operation1997
44.   Analysis of Ammonia Plant-2 feed water pump turbotrain (TP+SR+P 21104A)vibration condition and behavior (INA-Petrokemija Kutina, Croatia) during steady state operation1997
45.   Vibrational behavior analysis of INA Petrokemija Kutina, Croatia Amonijak - 2 plant machines included in predictive maintenance program (18 turbines, 12 compressors, 23 pumps, 2 hydro turbines, 3 fans)1997
46.   Analysis of ibration condition of Ammonia and Urea Plant-2 turbomachinery oil consol machines (Petrokemija Kutina,Croatia) during steady state operation (7 turbines + 7 pumps)1997
47.   Troubleshooting of Ammonia Plant-2 air compressor turbotrain TC+SM+ C 21101LP+HP (INA Petrokemija Kutina, Croatia) high vibration problem and disturbances1997
48.   Vibration condition and behavior analysis Ammonia Plant-2 air compressor turbotrain TC+SM+ C 21101LP+HP ( INA Petrokemija Kutina, Croatia) during no disturbance operation1997
49.   Analysis of of Ammonia Plant-2 air compressor turbotrain TC+SM+C 21101LP+HP (INA Petrokemija Kutina, Croatia) during startup and steady state operation1997
50.   Analysis of of Ammonia Plant-2 gas compressor turbotrain TC+C 21102LP+HP (INA Petrokemija Kutina, Croatia) during startup and steady state operation1997
51.   Analysis of Ammonia Plant-2 air compressor gearbox SM 21101 vibration problem (INA Petrokemija Kutina, Croatia)1998
52.   Analysis of mechanical (vibrational) condition of Ammonia Plant-2 sysnthesis gas turbotrain turbine TC 21103 (INA Petrokemija Kutina, Croatia) after inspection from 19.06. to 23.06.1997.1997
53.   Analysis of of Ammonia Plant-2 synthesis gas compressor turbotrain TC+C 21103LP+HP (INA Petrokemija Kutina, Croatia) during startup and steady state operation1997
54.   Analysis of Ammonia Plant-2 refrigerant compressor turbotrain TC+C21105LP+HP vibrationcondition and behavior (INA Petrokemija Kutina, Croatia)1997
55.   Vibration condition and behavior analysis of turbotrain TB+SR+B21101 in Ammonia Plant-2 of INA Petrokemija Kutina, Croatia during steady state operation1997
56.   Vibration condition and behavior analysis of turbotrain TB +SR+B21102 in Ammonia Plant-2 of INA Petrokemija Kutina, Croatia during steady state operation1997
57.   Analysis of vibration condition and behavior of Urea Plant-2 turbotrain TC+ SM+C 22112LP+HP in INA Petrokemija Kutina, Croatia during startup and steady state operation1997
58.   Analysis of vibration condition and behavior Methanol Plant sysnthesis gas compressor (GT201 + C201+202) during startup and loading (Nafta Lendava, Slovenia)1998
59.   Power Plant Tuzla (BiH) 200 MW turbogenerator (Unit 5) vibration condition and behavior1998
60.   Power Plant Tuzla (BiH) 215 MW turbogenerator (Unit 6) vibration condition and behavior1998
61.   Power Plant Tuzla (BiH) 200 MW turbogenerator (Unit 5) vibration condition and behavior1998
62.   Analysis of vibration condition of Ammonia Plant turbotrains (TC+SM+C21101LP+HP,TC+C21102LP+HP, TC+C21103LP+HP and TC+C21105LP+HP) in INA Petrokemija Kutina, Croatia1998
63.   Analysis of vibration condition and behavior of Nitric Acid-2 Plant turbotrain (steam turbine+axial air compressor+gas centrifugal compressor+gas expander) in INA Petrokemije Kutina, Croatia1998
64.   Ammonia Plant-2 gas compressor turbotrain (TC+C 21102LP+HP) vibration condition and behavior analysis (INA Petrokemije Kutina, Croatia) during steady state operation and shutdown for overhaul1998
65.   Ammonia Plant-2 air compressor turbotrain (TC+SM+C 21101LP+HP) vibration condition and behavior analysis (INA Petrokemije Kutina, Croatia) during steady state operation and shutdown for overhaul1998
66.   Ammonia Plant-2 synthesis compressor turbotrain (TC+C 21103LP+HP) vibration condition and behavior analysis (INA Petrokemije Kutina, Croatia) during steady state operation and shutdown for overhaul1998
67.   Ammonia Plant-2 ammonia refrigerant compressor turbotrain (TC+C 21105LP+HP) vibration condition and behavior analysis (INA Petrokemije Kutina, Croatia) during steady state operation and shutdown for overhaul1998
68.   Analysis of vibration condition of Nitric Acid-1 turbotrin 1 (INA Petrokemije Kutina, Croatia)1998
69.   Urea Plant-2 turbotrain (TC+SM+C 22112LP+HP) vibration condition and behavior analysis (INA Petrokemije Kutina, Croatia) during steady state operation and shutdown for overhaul1998
70.   Ammonia Plant-2 air compressor turbotrain (TC+SM+C 21101LP+HP) vibration condition and behavior analysis (INA Petrokemije Kutina, Croatia) during startup, loading and steady state operation after overhaul1998
71.   Ammonia Plant-2 gas compressor turbotrain (TC+C 21102LP+HP) vibration condition and behavior analysis (INA Petrokemije Kutina, Croatia) during startup, loading and steady state operation after overhaul1998
72.   Ammonia Plant-2 synthesis compressor turbotrain (TC+C 21103LP+HP) vibration condition and behavior analysis (INA Petrokemije Kutina, Croatia) during startup, loading and steady state operation after overhaul1998
73.   Ammonia Plant-2 ammonia refrigerant compressor turbotrain (TC+C 21105LP+HP) vibration condition and behavior analysis (INA Petrokemije Kutina, Croatia)during startup, loading and steady state operation after overhaul1998
74.   Urea Plant-2 turbotrain (TC+SM+C 22112LP+HP) vibration condition and behavior analysis (INA Petrokemije Kutina, Croatia) during startup, loading and steady state operation after overhaul1998
75.   Power Plant Tuzla (BiH) 200 MW turbogenerator (Unit 5) vibration condition and behavior1998
76.   Power Plant Tuzla (BiH) 200 MW turbogenerator (Unit 4) vibration condition and behavior1998
77.   Power Plant Tuzla (BiH) 100 MW turbogenerator (Unit 3) vibration condition and behavior1998
78.   Analysis of vibration condition and behavior Methanol Plant sysnthesis gas compressor (GT201 + C201+202) during steady stateoperation and shutdown (Nafta Lendava, Slovenia)1998
79.   Analysis of vibration condition and behavior Methanol Plant sysnthesis gas compressor (GT201 + C201+202) during startup and loading (Nafta Lendava, Slovenia) during startup1998
80.   Vibration condition and behavior analysis of Siemens 5 MW turbogenerator in Papirnica Radece (Paper Mill), Radeče, Slovenia, during steady state operation1999
81.   Power Plant Šoštanj (Slovenia) Unit 5 345 MW turbogenerator vibration analysis during steady state operation1999
82.   Power Plant Tuzla (BiH) 215 MW turbogenerator (Unit 6) vibration condition and behavior analysis1999
83.   Vibration condition and behavior analysis of 345 MW turbogenerator (Unit 5) of Power Plant (PP) Šoštanj, Slovenia, during steady state operation1999
84.   Ethylen Plant crack gas compressor turbotrain R1 (steam turbine+LP compressor+gear box+HP compressor vibration condition and behavior analysis (HIP Petrohemija Pancevo, Serbia and Montenegro) during steady state operation1999
85.   Ethylen Plant prophylen compressor turbotrain R2 (steam turbine+compressor) vibration condition and behavior analysis (HIP Petrohemija Pancevo, Serbia and Montenegro) during steady state operation1999
86.   Ethylen Plant ethylen compressor turbotrain R3 (steam turbine+compressor) vibration condition and behavior analysis (HIP Petrohemija Pancevo, Serbia and Montenegro) during steady state operation1999
87.   Vibration condition and behavior analysis of Etilen plant turbotrain R3 in HIP Petrohemija Pancevo, Serbia and Montenegro during steady state operation1999
88.   Vibration condition and behavior analysis of Etilen plant turbotrain R1 in HIP Petrohemija Pancevo, Serbia and Montenegro during steady state operation1999
89.   Vibration condition and behavior analysis of Etilen plant turbotrain R2 in HIP Petrohemija Pancevo, Serbia and Montenegro during steady state operation1999
90.   Vibration condition and behavior analysis of Etilen plant turbotrain R3 in HIP Petrohemija Pancevo, Serbia and Montenegro during steady state operation1999
91.   Vibration condition and behavior analysis of Etilen plant compressor turbotrain R3 HIP Petrohemija Pancevo, Serbia and Montenegro after startup1999
92.   Vibration condition and behavior analysis of Etilen plant turbotrain R1 in HIP Petrohemija Pancevo, Serbia and Montenegro, during startup, loading and steady state operation after overhaul1999
93.   Vibration problem analysis of Etilen plant oil pump turbotrain R1 in HIP Petrohemija Pancevo, Serbia and Montenegro Etilen plant1999
94.   Power Plant Tuzla (BiH) 200 MW turbogenerator (Unit 5) vibration condition and behavior2000
95.   Vibration condition and behavior analysis of Etilen plant turbotrain R1 in HIP Petrohemija Pančevo, Serbia and Montenegro, during steady state operation2000
96.   Vibration condition and behavior analysis of Etilen plant turbotrain R2 in HIP Petrohemija Pančevo, Serbia and Montenegro, during steady state operation2000
97.   Vibration condition and behavior analysis of Etilen plant turbotrain R3 in HIP Petrohemija Pančevo, Serbia and Montenegro, during steady state operation2000
98.   Analysis of vibration condition of Etilen plant boiler B fan in HIP Petrohemija Pancevo, Serbia and Montenegro, during steady state operation2000
99.   Vibration condition analysis of Etilen plant feed pump turbotrain P 1001A in HIP Petrohemija Pancevo, Serbia and Montenegro Etilen plant2000
100.        Vibration condition analysis of Etilen plant feed water pump turbotrain P 1001B in HIP Petrohemija Pancevo, Serbia and Montenegro2000
101.        Vibration condition analysis of Etilen plant feed water pump turbotrain P 1001C in HIP Petrohemija Pancevo, Serbia and Montenegro2000
102.        Analysis of vibration condition and behavior of 50 MW turbogeneratora (Unt 3) of Termoelektrana Toplarna Ljubljana, Slovenia, during steady state operation, unloading and shutdown for overhaul2000
103.        Vibration condition and behavior analysis of 30 MW turbogenerator (Unit 1) in Termoelektrana Toplarna Ljubljana, Slovenia during steady state operation2000
104.        Complex vibration problem analysis of Refinery Sisak Power Plant's 30 MW turbogenerator during startup, steady state operation and shutdown (INA, Croatia)2000
105.        Vibration condition and behavior analysis of Methanol Plant synthesis compressor turbotrain (GT201 + C201+202) in Nafta Lendava, Slovenia, during steady state operation2000
106.        High vibration amplitudes problem analysis of FCC Plant's turbine TGB 2501 in NIS Refinery Pancevo, Serbia and Montenegro, with recommendations for operation2000
107.        Vibration condition and behavior analysis of FCC Plant's turbine TGB 2301 and compressor GB 2301 in NIS-Refinery Pancevo, Serbia and Montenegro, with operation recommendations2000
108.        Analysis of vibration and mechanical condition of Ethylen Plant's turbotrains R1 and R2 in HIP Petrohemija Pancevo, Serbia and Montenegro, during steady state operation2000
109.        Vibration condition analysis of Ethylen Plant's turbotrain R2 in HIP Petrohemija Pancevo, Serbia and Montenegro, during steady state operation2000
110.        Vibration condition analysis of Ethylen Plant's turbotrain R2 in HIP Petrohemija Pancevo, Serbia and Montenegro, during steady state operation2000
111.        Analysis of FCC Plant turbine TGB 2301 and compressor GB 2301 problems in NIS-Refinery Pancevo, Serbia and Montenegro, during startup, steady state operation and shutdown with operation recommendations2000
112.        Analysis of vibration condition and behavior of Ethylen Plant's turbotrain R1 in HIP Petrohemija Pancevo, Serbia and Montenegro, after overhaul and demagnetization 2000
113.        Vibration behavior analysis of turbotrain Ethylen Plant's R2 turbotrain in HIP Petrohemija Pancevo,Sewrbia and Montenegro, during startup and steady state operation with load increase2000
114.        Vibration condition and behavior analysis of Etilen plant turbotrain R3 in HIP Petrohemija Pančevo, Serbia and Montenegro, during steady state operation2000
115.        Vibration condition and behavior analysis of Methanol Plant synthesis compressor turbotrain (GT201 + C201+202) in Nafta Lendava, Slovenia, during steady state operation2001
116.        Vibration condition and behavior analysis of Power Plant's 7 MW turbogenerator in Nafta Lendava, Slovenia, during steady state operation2001
117.        Vibration condition and behavior analysis of Methanol Plant synthesis compressor turbotrain (GT201 + C201+202) in Nafta Lendava, Slovenia, during steady state operation and shutdown for overhaul2001
118.        Vibration condition analysis of cooling towers fans in Energetika plant of Nafta Lendava, Slovenia, during steady state operation and shutdown2001
119.        Vibration condition and behavior analysis of Power Plant's 7 MW turbogenerator in Nafta Lendava, Slovenia, during steady state operation and shutdown2001
120.        Vibration condition and behavior analysis of Power Plant's 7 MW turbogenerator in Nafta Lendava, Slovenia, during startup, loading and steady state operation2001
121.        Vibration condition and behavior analysis of Methanol Plant's synthesis compressor turbotrain (GT201 + C201+202) in Nafta Lendava, Slovenia, during startup, loading and steady state operation2001
122.        Analysis of vibration condition and behavior of Ethylen Plant's turbotrain R1 in HIP Petrohemija Pancevo, Serbia and Montenegro, after overhaul and demagnetization 2001
123.        Vibration behavior analysis of Ethylen Plant's R2 turbotrain in HIP Petrohemija Pancevo, Serbia and Montenegro, during startup and steady state operation with load increase2001
124.        Vibration behavior analysis of Ethylen Plant's R3 turbotrain in HIP Petrohemija Pancevo, Serbia and Montenegro, during startup and steady state operation with load increase2001
125.        Balancing and vibration condition and behavior analysis of fan CM-102AX in Etan plant (Ivanic Grad) of INA-Naftaplian, Croatia2001
126.        Balancing and vibration condition and behavior analysis of fan CM-102BX 102AX in Etan plant (Ivanic Grad) of INA-Naftaplian, Croatia2001
127.        Balancing and vibrational behavior analysis of fan CM-103X 102AX in Etan plant (Ivanic Grad) of INA-Naftaplian, Croatia2001
128.        Balancing and vibration condition and behavior analysis of fan CM-701BX 102AX in Etan plant (Ivanic Grad) of INA-Naftaplian, Croatia2001
129.        Vibration condition and behavior analysis of 215 MW turbogenerator (Unit 6) in „Power plant Tuzla ", Tuzla, BiH, during steady state operation and shutdown with special analysis of high vibration levels problem on bearings no. 5 and 62001
130.        Anakysis of PP Tuzla's 200 MW turbogenerator (Unit 5) vibration condition and behavior (Tuzla, BiH), during steady state operation and shutdown2001
131.        Vibration condition and behavior analysis of pressure fan trains Ta1 and Ta2 in Clinical hospital Dubrava, Zagreb, Croatia2001
132.        Vibration condition and behavior analysis of suction fan trains Oa1 and Oa2 in Clinical hospital Dubrava, Zagreb, Croatia2001
133.        Vibrational behavior analysis of pressure fan trains Tb1 and Tb2 in Klinicka bolnica Dubrava, Zagreb, Croatia2001
134.        Vibrationcondition and behavior analysis of suction fan trains Ob1 and Ob2 in Clinical hospital Dubrava, Zagreb, Croatia2001
135.        Vibration condition and behavior analysis of pressure fan trains Tc1 and Tc2 in Clinical hospital Dubrava, Zagreb, Croatia2001
136.        Vibration condition and behavior analysis of suction fan trains Oc1 and Oc2 in Clinical hospital Dubrava, Zagreb, Croatia2001
137.        Vibration condition and behavior analysis of pressure fan trains Td1 and Td2 in Clinical hospital Dubrava, Zagreb, Croatia2001
138.        Vibration condition and behavior analysis of suction fan trains Od1 and Od2 in Clinical hospital Dubrava, Zagreb, Croatia2001
139.        Vibration condition and behavior analysis of pressure fan trains Te1 and Te2 in Clinical hospital Dubrava, Zagreb, Croatia2001
140.        Vibration condition and behavior analysis of pressure fan trains Tf1 and Tf2 in Clinical hospital Dubrava, Zagreb, Croatia2001
141.        Vibration condition and behavior analysis of suction fan trains Oef1 and Oef2 Clinical hospital Dubrava, Zagreb, Croatia2001
142.        Vibration condition and behavior analysis of pressure fan trains Tg1 and Tg2 in Clinical hospital Dubrava, Zagreb, Croatia2001
143.        Vibration condition and behavior analysis of suction fan trains Og1 and Og2 in Clinical hospital Dubrava, Zagreb, Croatia2001
144.        Vibration condition and behavior analysis of 215 MW turbogenerator (Unit 6) in „Power plant Tuzla ", Tuzla, BiH, during steady state operation2001
145.        Vibration condition analysis of Ethylen Plant's turbotrain R1 in HIP Petrohemija Pancevo, Serbia and Montenegro, during steady state operation2001
146.        Vibration condition analysis of Ethylen Plant's turbotrain R2 in HIP Petrohemija Pancevo, Serbia and Montenegro, during steady state operation2001
147.        Vibration condition analysis of Ethylen Plant's turbotrain R3 in HIP Petrohemija Pancevo, Serbia and Montenegro, during steady state operation2001
148.        Analysis of vibration condition of rotary screw compressor train C-160 A , Underground Gas Storage, PSP Okoli, INA-Naftaplina,Croatia2001
149.        Analysis of vibration condition of rotary screw compressor train C-160 B , Underground Gas Storage, PSP Okoli, INA-Naftaplina,Croatia2001
150.        Vibration condition and behavior analysis of turbotrain FCC Plant's turbotrain TGB+B 2501 in NIS-Refinery Pancevo, Serbia and Montenegro2001
151.        Power Plant Tuzla (BiH) 210 MW turbogenerator (Unit 5) vibration condition and behavior analysis2001
152.        Vibration condition and behavior analysis of turbotrain FCC Plant's turbotrain TGB+B 2501 in NIS-Refinery Pancevo, Serbia and Montenegro2001
153.        High vibration levels problem analysis of diesel engine in INA-Naftaplin, Ivanicko Graberje, Croatia2001
154.        Vibration condition and behavior analysis of 30 MW turbogenerator (Unit 1) in PP Šoštanj, Slovenia, during steady state operation at various loads and shutdown before overhaul2001
155.        Vibration condition and behavior analysis of 30 MW turbogenerator (Unit 2) in PP Šoštanj, Slovenia, during steady state operation at various loads and shutdown before overhaul2001
156.        Vibration condition and behavior analysis of 30 MW turbogenerator (Unit 1) in PP Šoštanj, Slovenia, during steady state operation during startup, loading and operation under various loads and shutdown after overhaul2001
157.        Vibration condition and behavior analysis of 30 MW turbogenerator (Unit 2) in PP Šoštanj, Slovenia, during steady state operation during startup, loading and operation under various loads and shutdown after overhaul2001
158.        Maeasurements and vibrational condition analysis of fan RDP in PP Šoštanj, Slovenia2001
159.        Analysisi andeExpert opinion on vibration condition and behavior of 345 MW turbogenerator (Unit 5) in PP Šoštanj, Slovenia with special analysis of high vibration levels problem on bearings no. 2 and 32001
160.        Vibration behavior analysis of 345 MW turbogenerator (Unit 5) in Power Plant (PP) Šoštanj, Slovenia, during startups on 04. and 05.11.2001.2001
161.        Analysis of Methanol Plant turbotrain GT201 + G201+202 vibration condition and behavior in Nafta Lendava, Slovenia during steady state operation and shutdown before overhaul2001
162.        Analysis of Power plant's 7 MW turbogenerator vibration condition and behavior in Nafta Lendava, Slovenia during steady state operation and shutdown for the overhaul2001
163.        Vibration condition and behavior analysis of Power Plant boiler fan train OE in Nafta Lendava, Slovenia during steady state operation2001
164.        Vibration condition and behavior analysis of turbine pump 2 train OE machines inPower Plant, Nafta Lendava, Slovenia during steady state operation2001
165.        Complex dana acquisition and analysis for finding root cause of high vibration levels on bearings no. 1 and 2 of 345 MW turbogenerator (Unit 5) n Power Plant Šoštanj, Slovenia2001
166.        Vibration condition and behavior analysis of Blower P1 machines on Formalin 1 Plant, Nafta Lendava, Slovenia during steady state operation2002
167.        Vibration condition and behavior analysis of Blower P2 machines on Formalin 1 Plant, Nafta Lendava, Slovenia during steady state operation2002
168.        Vibration condition and behavior analysis of Blower P2 machines on Formalin 1 Plant, Nafta Lendava, Slovenia during steady state operation after overhaul2002
169.        Vibration condition and behavior analysis of Blower P1 machines on Formalin 1 Plant, Nafta Lendava, Slovenia during steady state operation after overhaul2002
170.        Complex vibration condition and behavior analysis of 100 MW turbogenerator MW machines and foundations on Unit 5 in „PP Kakanj "Kakanj, B and H, during steady state operation with evaluation of fundation suitability for the new turbine instalation2002
171.        Analysis of vibration condition and behavior of Power Plant's 7 MW turbogenerator, Nafta Lendava, Slovenia during startup and steady state operation after overhaul2002
172.        Analysis of vibration condition and behavior of blower C-17 in Etan P lant, INA-Naftaplina, Ivanic Grad, Croatia during startup and steady state operation2002
173.        Analysis of vibration condition and and balancing of pressure fan TA1 section A in Clinic Hospital" Dubrava ", Zagreb, Croatia2002
174.        Analysis of vibration condition and and balancing of pressure fan TA2 section A in Clinic Hospital" Dubrava ", Zagreb, Croatia2002
175.        Analysis of the FCC Plant's turbotrain TGB+B 2501 high vibration problem, NIS-refinery Rafinerija Pancevo, Serbia and Montenegro2002
176.        FCC Plant's turbotrain TGB+B 2301 machines vibration condition and behavior analysis during steady state operation and shutdown before overhaul in NIS-refinery Pancevo, Serbia and Montenegro2002
177.        FCC Plant's turbotrain TGB+B 2501 machines vibration condition and behavior analysis during steady state operation and shutdown before overhaul in NIS-refinery Pancevo, Serbia and Montenegro2002
178.        Analysis of Vibration condition and behavior of 100 MW turbogenerator machines and foundations in blok 6 „PP Kakanj "Kakanj, B and H, during steady state operation and shutdown before overhaul2002
179.        FCC Plant's turbotrain TGB+B 2301 machines vibration condition and behavior analysis during startiup and steady state operation after overhaul in NIS-refinery Pancevo, Serbia and Montenegro2002
180.        FCC Plant's turbotrain TGB+B 2501 machines vibration condition and behavior analysis during startiup and steady state operation after overhaul in NIS-refinery Pancevo, Serbia and Montenegro2002
181.        Analysis of high vibration amplitudes problem on bearings no. 1 and 2 of 345 MW turbine(Unoit 5), Termoelektrarna (Power plant), Šoštanj Slovenia2002
182.        Analysis of turbine TGB 2501 high vibration levels problem on FCC plant, NIS-RefineryPancevo, Serbia and Montenegro during startup and steady state operation after overhaul2002
183.        Analysis of compressor B 2501 high vibration levels problem on FCC plant, NIS-Refinery Pancevo, Serbia and Montenegro after overhaul2002
184.        Analysis of compressor B 2301 high vibration levels problem on FCC plant, NIS-Refinery Pancevo, Serbia and Montenegro after overhaul2002
185.        Vibration condition and behavior analysis of gas turbogenerator machines on Ethan Plant (Ivanic Grad) INA-Naftaplina, Croatia2002
186.        Analysis of vibration condition and behavior of 70 MW gas turbine turbogenerator GT-1 in Termoelektrana-Toplana, Zagreb, Croatia2002
187.        Analysis of vibration condition and behavior of 70 MW gas turbine turbogenerator GT-2 in Termoelektrana-Toplana, Zagreb, Croatia2002
188.        Vibration condition and behavior analysis of turbogenerator 110 MW machines of „PP " Kakanj " Kakanj, B and H, during startup, losding and steady state operation2002
189.        Vibration condition and behavior analysis of 210 MW turbogenerator (Unit 5) in „Power plant Tuzla ", Tuzla, BiH, during steady state operation2002
190.        Analysis of aggravated vibrational condition and behavior of 210 MW turbogenerator machines in Power Plant Plomin, Plomin, Croatia2002
191.        Analysis of aggravated vibrational behavior of gas turbine of 110 MW turbogenerator GT-14 in Termoelektrarna Brestanica, Brestanica, Slovenia2002
192.        Vibration condition and behavior analysis of gas turbine 110 MW turbogenerator GT-14 in Termoelektrarna Brestanica, Brestanica, Slovenia after repairs2002
193.        Analysis of aggravated vibrational behavior of Unit 5 345 MW turbine in Termoelektrarna (Power Plant) Šoštanj, Slovenia2002
194.        Analysis of high vibration problem of turbogenerator 1 machines (gas turbine+gear box+generator) in Ethan Plant, INA-Naftaplin, Ivanic Grad, Croatia2002
195.        Analysis of 100 MW (Unit 3) turbogenerator (turbine+generator) brgs. 3 and 4 high vibrations problem after overhaul in august in blok 3, „Power Plant Tuzla“, Tuzla, B&H2002
196.        Analysis of vibration condition and behavior analysis of all 100 MW turbogenerator machines (Unit 3) in november, „Power Plant Tuzla“, Tuzla, B&H with special analysis of high vibration problem on bearing no. 1 and bearing modeling2002
197.        Vibration condition and behavior analysis of 200 MW turbogenerator machines (Unit 4) in „Power Plant Tuzla“, Tuzla, B&H after overhaul and reconstruction with creation of reference database of vibrational and other data2002
198.        Vibration condition and behavior analysis of all machines (gas turbine, gearbox, generator) of 110 MW turbogenerator GT-15, Termoelektrarna (Power plant) Brestanica, Slovenia2002
199.        Analysis of 345 MW turbinogenerator (Unit 5) high vibration levels and bearing no. 2 failure in Termoelektrarna (Power Plant) Šoštanj, Slovenia, with recommendations for bearing design modifications2002
200.        Analysis of the high vibration levels problem of blower C-17 B with rotor balancing in Ethan plant, INA-Naftaplin, Ivanic Grad, Croatia2003
201.        Vibration condition and behavior analysis of turbogenerator 2 machines, (gas turbine+gear box+generator) of Ethan Plant, INA-Naftaplin, Ivanic Grad, Croatia2003
202.        Predictive maintenance program (regular vibrodiagnostics) of 46 machines in Termoelektrarna (Power Plant ) Šoštanj, Slovenia2003
203.        Base vibration condition and behavior analysis of 46 machines in PP Šoštanj, Slovenia (turbogenerators 345 MW, 275 MW, 75 MW and 2X30 MW, feed pumps, fans,...)2003
204.        Vibration condition and behavior analysis of Unit 3 23 MW turbogenerator (gas turbine, gearbox , generator), Power Plant Brestanica, Slovenia2003
205.        Vibration condition and behavior analysis of turbogenerator 2 machines, (gas turbine+gear box+generator) of Ethan Plant, INA-Naftaplin, Ivanic Grad, Croatia2003
206.        Vibration condition and behavior analysis of blower C-17 in Ethan Plant, INA-Naftaplin, Ivanic Grad, Croatia2003
207.        Reference vibration condition and state analysis of reciprocating compressors on Ethan Plant, INA-Naftaplin, Ivanic Grad, Croatia2003
208.        Analysis of vibration condition and behavior of reciprocating compressor on Etan plant after modifications, INA-Naftaplina Ivanic Grad, Croatia2003
209.        Analysis of high vibration levels problem of FCC Plant turbocompressor GB 2501 in NIS-Refinery Pancevo, Serbia and Montenegro2003
210.        Vibration condition and behavior analysis of Unit 2 23 MW turbogenerator (gas turbine, gearbox , generator), Power Plant Brestanica, Slovenia2003
211.        Vibration condition and behavior analysis of 345 MW turbogenerator (Unit 5), Termoelektrarna (Power Plant) Šoštanj, Slovenia2003
212.        Vibration condition and behavior analysis of all machines (gas turbine, gearbox, generator) of 110 MW turbogenerator GT-14 in Termoelektrarna (Power plant) Brestanica, Slovenia2003
213.        Vibration condition and behavior analysis of all 200 MW turbogenerator (Unit 5) machines in „Power Plant Tuzla", Tuzla, BiH after overhaul and modernization with creation of reference database of vibrational and other data2003
214.        Analysis of vibration condition and behavior of 32 MW turbogenerator (turbine+generator) in TE-TOL, Ljubljana, Slovenia2003
215.        Vibration condition and behavior analysis of all 110 MW turbogenerator machines (gas turbine, gearbox, generator) GT-15 in PP Brestanica, Slovenia2004
216.        Vibration condition and behavior analysis of Unit 3 75 MW generator in Power Plant Šoštanj, Slovenia during complex generator's high vibration problem investigation and testing with load variations2004
217.        Vibration condition and behavior analysis of Unit 3 75 MW generator in Power Plant Šoštanj, Slovenia2004
218.        Vibration condition and behavior analysis of Unit 1 23 MW turbogenerator (gas turbine, gearbox , generator), Power Plant Brestanica, Slovenia2004
219.        Vibration condition and behavior analysis of Unit 2 23 MW turbogenerator (gas turbine, gearbox , generator), Power Plant Brestanica, Slovenia2004
220.        Vibration condition and behavior analysis of electro motor and gerbox of extruder in Plant DIOKI d.d. Zagreb, Croatia2004
221.        Analysis of vibrational condition and behavior of 210 MW turbogenerator (Unit 2) in Power Plant Plomin, Croatia2004
222.        Analysis of vibration condition and behavior of all 110 MW turbogenerator GT-14 machines (gas turbine+gear box+generator) in Power Plant Brestanica, Slovenia during start-up, steady state and shut-down after overhaul2004
223.        Analysis of vibration condition and behavior of 75 MW turbine and generator (Unit 3) in Power Plant Šoštanj, Slovenia, after overhaul2004
224.        Vibration condition and behavior analysis of 30 MW turbogenerator (turbine+generator) of Unit 1 in Power Plant Šoštanj, Slovenia before overhaul2004
225.        Vibration condition and behavior analysis of electromotor and fan on pressure train 2 of air-conditioning system G in KB Dubrava, Zagreb during steady state operation2004
226.        Vibration condition and behavior analysis of electromotor and fan on pressure train 1 of air-conditioning system G in KB Dubrava, Zagreb during steady state operation2004
227.        Vibration condition and behavior analysis of electromotor and fan on suction train 2 air-conditioning G KB Dubrava, Zagreb, croatia during steady state operation2004
228.        Vibrational behavior analysis and balancing of electromotor and fan on laundry system in KB Dubrava, Zagreb, Croatia2004
229.        Analysis of ibration condition and behavior of 3223 MW gas turbogenerator (turbine, gearbox, generator) of Unit 3 in Power Plant Brestanica, Brestanica, Slovenia2004
230.        Overhaul, balancing and vibration condition and behavior analysis of electro motor and fan in incinerator unit in KB Dubrava, Zagreb, Croatia2004
231.        Vibration condition and behavior analysis and balacing of pump Traint 807a in Ethan plant Ivanić Grad, INA-Naftaplina d.d. Zagreb, Croatia2004
232.        Analysis of vibration condition and behavior of 30 MW turbine and generator (Unit 1) in Power Plant Šoštanj, Slovenia during startup, loading and steady state operation after overhaul2004
233.        Analysis of vibration condition and behavior of 30 MW turbine and generator (Unit 2) in Power Plant Šoštanj, Slovenia during steady state operation, unloading and shutdown for overhaul2004
234.        Analysis of vibration condition and behavior of 30 MW turbine and generator (Unit 2) in Power Plant Šoštanj, Slovenia during startup, loading and steady state operation after overhaul2004
235.        Analysis of high vibration problem of FCC Plant turbotrain train GB 2501 in NIS-Refinery Pančevo, Serbia and Montenegro,2004
236.        Vibration condition and behavior analysis and balncing of fan in laundry unit of KB (Clinical Hospital) Dubrava, Zagreb, Croatia2004
237.        Vibration condition and behavior analysis of rotary furnace burner in GD Granit AD, Podružnica Zagreb, Asfaltna baza Okućani, Croatia2004
238.        Vibration condition and behavior analysis and balncing of turbine space airing fan pogona Etan, Ivanić Grad, INA-Naftaplina, Zagreb, Croatia2004
239.        Analysis of vibration condition and behavior od Unit 1 32 MW turbine and generator in TE-TOL Ljubljana, Slovenia2004
240.        Vibration condition analysis and balancing of electromotor rotor 90 kW for Mato el-d. Ivanić Grad, Croatia2004
241.        Vibration condition and behavior analysis of suction fan train in laundry plant of KB Dubrava, Zagreb, Croatia2004
242.        Analysis of vibrational condition and behavior of turbogenerator 1 machines (gas turbine+gear box+generator) in Ethan plant Ivanić Grad, INA-Naftaplin, Croatia2004
243.        Balancing of electromotor rotor 55 kW for Mato el-d Ivanić Grad, Croatia2004
244.        Vibration condition and behavior analysis of compressor train C-801A in Ethan Plant of INA Naftaplina, Ivanić Grad, Croatia2004
245.        Vibration condition and behavior analysis of compressor train C-801B in Ethan Plant,INA Naftaplin, Ivanić Grad, Croatia2004
246.        Bently Nevada System 1 platform optimalization on 289 MW turbogenerator (Unit 4) in Power Plant Šoštanj, Slovenia2004
247.        Detailed analysis of vibration condition and behavior of 289 MW turbine and generator (Unit 4) Power Plant Šoštanj, Slovenia during staertups, various loads operatrions and shutdowns2004
248.        Analysis of vibration condition and behavior of turbogenerator 1 (gas turbine+gear box+generator) in Ethan Plant Ivanić Grad, INA-Naftaplin, Croatia2005
249.        Vibration condition and behavior analysis of 125 MW turbine and generator (Unit 1) in Power Plant Plomin during steady state operation, unloading and shutdown before overhaul2005
250.        Unit 1 feed water pump trains (2 pcs) vibration condition and behavior analysis in Power Plant Plomin, Croatia befor overhaul2005
251.        Vibration condition and behavior analysis of 32 MW turbogenerator (Unit 1) in TE-TOL Ljubljana, Slovenia with special analysis of front turbine bearing journal hig vibration problem2005
252.        Analysis of vibration condition and behavior of 320 MW turbogenerator (turbine+generator) in Power Plant Rijeka , Croatia, after overhaul2005
253.        Vibration condition and behavior analysis of Unit 4 115 MW turbogenerator machines (gas turbine+gear box+generator) in Power Plant Brestanica, Slovenia after on-site balancing2005
254.        Predictive maintenance program and base vibration analysis of machines in Plant Messer Kutin, Croatia 2005
255.        Analysis of vibration condition and behavior and balansing of 100 MW turbine (Unit 3) in Power Plant Tuzla, B&H2005
256.        Analysis of vibration condition and modeling of measuring piping lines in Underground Gas Storage PSP Okoli, Okoli, Croatia2005
257.        Analysis of vibration condition of turbogenerator 1 (gas turbine+gear box+generator) in Ethan plant Ivanić Grad, INA-Naftaplin, Croatia2006
258.        Analysis of the high vibration amplitudes problem of 45 MW turbine (Unit 3) TE-TOL Ljubljana, Slovenia2006
259.        Analysis of the high vibration amplitudes problem of 125 MW (Unit 1) LP turbine and generator in Power Plant Plomin, Croatia2006
260.        Vibration condition and behavior analysis of 125 MW turbogenerator in Power Plant Plomin, croatia during steady state operation, unloading and shutdown before overhaul2006
261.        Vibration condition and behavior analysis of FCC's turbotrain TGB+B 2501 in NIS-refinery Rafinery Pančevo, Serbia2006
262.        Analysis of vibrational condition and behavior of Unit 3 45 MW turbogenerator during steady state and shut-down before overhaul in TETO Osijek, Croatia2006
263.        Vibration condition nalysis of booster primary compressor in DIOKI d.d, Zagreb during numerous start-ups, shut-downs and steady state operations2006
264.        Vibration condition and behavior analysis of Unit 2 210 MW turbogenerator machines in Power Plant Plomin, Croatia during steady state operation, load variations, shut-down and start-up2006
265.        Complex analysis of high relative shaft vibration amplitudes on first bearing journal on the HP turbine of the 125 MW turbogenerator in Power Plant Plomin, Croatia  after overhaul2006
266.        Vibration condition and behavior analysis of blower C-17 A in Ethan Plant, INA-Naftaplin, Ivanic Grad, Croatia2006
267.        Analysis of high generator shaft vibration amplitudes of the 320 MW turbogenerator in Power Plant  Rijeka, Croatia during shut-down 2006
268.        Vibration condition and behavior analysis of 45 MW turbogenerator in TE-TO Osijek after overhaul and additional generator repairs2006
269.        Vibration condition and behavior analysis and balancing of a stone crusher in Šumber quarry, Labin, Croatia2006
270.        Vibration condition and behavior analysis and balancing of waste air suction fan in Sirela Bjelovar, Croatia2006
271.        Analysis of high generator's rotor vibration amplitudes on 320 MW turbogenerator in Power Plant Rijeka ,Croatia, during shutdown on 21.10.2006.2006
272.        Analysis of vibrational condition and behavior of 45 MW turbogenerator machines in TE-TO Osijek, Croatia, during start-up, loading and steady state operation on 26.11.2006. after generator repairs2006
273.        Vibration condition and behavior analysis of 125 MW turbogenerator (Unit 1) in Power Plant Plomin, Croatia during start-up and steady state after overhaul2006
274.        Complex analysis of high journal vibration on bearing no. 1 of 125 MW turbine in PP Plomin after overhaul2006
275.        Analysis of cause of increase of journal vibration on bearing no. 4 of 125 MW turbine in Power Plant Plomin, Croatia 2006
276.        Vibrational behavior analysis of turbocharger C-17-A INA-Naftaplin, Etan, Ivanić Grad, during steady state operation on 26.07.2006.2006
277.        On site balancing of TESAB 1012-4 crusher in Šumber quarry2007
278.        Vibration condition and behavior analysis of GT1 turbogenerator in INA-Naftaplina, Etan, Ivanić Grad,Croatia on 10.05.2007.2007
279.        Vibration condition and behavior analysis of 125 turbogenerator in Power Plant Plomin from 05.04. till 04.05.07. and during stady state operation unloading and shutdown befor overhaul in 2007.2007
280.        Vibration condition and behavior analysis of rotating and reciprocating machines in Messer Kutina, Croatia 2007
281.        Analysis of vibration condition and behavior analysis of Unit 5 345 MW turbogenerator machines in Power Plant Šoštanj, Slovenia, during stady state operation,unloading and shutdown before overhaul on 26/27. 04. 2007.2007
282.        On site balancing of cooling tower fan in Tang, Nova Gradiška, Croatia2007
283.        On site balancing of TESAB 1012-4 crusher in Šumber quarry, Croatia2007
284.        Vibration condition r analysis and on-site balancing of fan in KB Dubrava, Zagreb, Croatia2007
285.        Vibration conditionn and behavior analysis of rotating and reciprocating machines after repairs in Messer Kutina, Croatia2007
286.        Analysis od vibrational condition and behavior of 210 MW turbogenerator in Power Plant Plomin, Croatia, during steady state,unloading and shutdownn and startup in April 2007.2007
287.        Vibrational condition and behavior analysis of 125 MW turbogenerator in Power Plant Plomin, Croatia in period from overhaul till 26.02.2007.2007
288.        Vibrational condition analysis and on-site balancing of fan in KB Dubrava, Zagreb, Croatia2007
289.        Vibrational condition and behavior analysis of 125 MW turbogenerator in Power Plant Plomin, Croatia in period from 05.04. till 04.05.07. and during shutdown before overhaul in 2007.2007
290.        Vibrational condition and behavior analysis of 30 MW turbogenerator in INA-Refinery Sisak, Croatia with emphasis on middle bearing block high vibration amplitudes2007
291.        Vibrational behavior analysis of 5 MW turbogenerator in Radeče papir d.d. during steady state operation, unloading and shutdown on 10. and 11. 08. 2007.2007
292.        Detailed analysis of high bearing block no. 2 (rear turbine and front generator bearing) vibration amplitudes of a 30 MW turbogenerator in INA Refinery Sisak (72 measurement locations – turbine, generator, base plaste, foundations) with dana acquisition during 18 start-ups, shutdowns and turbogenerator loading2007
293.        Vibrational condition and behavior analysis and on-site balancing of fan in KB Dubrava, Zagreb, Croatia2007
294.        Vibrational condition and behavior analysis of 345 MW turbogenerator (Unit 5) in Power Plant Šoštanj, Slovenia, during start-up, loading and steady state operation after overhaul2007
295.        Vibrational condition and behavior analysis of 45 MW turbogenerator in TE-TO Osijek during start-up, loading and steady state operation after overhaul on 29.06.2007.2007
296.        Analysis of cause of Increased rear generator bearing (no. 7.) journal vibration on 125 MW turbogenerator in Power Plant Plomin, Croatia2007
297.        Analysis of very high vibration problem of exhaust gasses fan no. 2 of Unit 6 in Power Plant Tuzla, B&H.2007
298.        Vibrational condition and behavior analysis of 125 MW turbogenerator in Power Plant Plomin, Croatia during start-up and steady state operation after overhaul2007
299.        Vibrational condition nalysis of furnace filter fan in ITV, Raša, Croatia2007
300.        Vibrational condition and behavior analysis of 32 MW turbogenerator in TE-TOL Ljubljana, Slovenia, on 09.12.2007. before and after gear removal from front bearing block2007
301.        Vibrational condition and behavior analysis of Hyper compressor BC-101 on Polyethylen plant in Dina Petrokemija d.d. on 06.12.2007.2007
302.        Vibrational condition and behavior analysis of rotating and reciprocating machines after repairs in Messer Kutina, Croatia2007
303.        Cyclone fan on-site balancing in Rockwool Adriatic d.o.o, Croatia2007
304.        On site balancing of TESAB 1012-4 crusher in Šumber quarry, Croatia2007
305.        Vibrational condition and behavior analysis of 125 MW turbogenerator in Power Plant Plomin, Croatia with emphasis on high generator casing vibration2007
306.        Alignment, on-site balancing and vibration analysis of fan in KB Dubrava, Zagreb, Croatia2007
307.        Vibrational condition and behavior analysis of synthesis gas turbotrain (GT201 + C201+202) on Methanol plant in NAFTA Petrochem d.o.o. Lendava, Slovenia, during steady state operation on 21.01.2008.2008
308.        Vibrational condition and behavior analysis of 7 MW turbogenerator in Power plant of INA Maziva Rijeka, Croatia during steady state operation and shut-down on 27.01.2008.2008
309.        Vibrational condition and behavior analysis of sythesis gas turbotrain (GT201 + C201+202) in Methanol plant in NAFTA Petrochem d.o.o. Lendava, Slovenia, during steady state operation and disturbance from 04.02. till 11.02.2008.2008
310.        Vibrational condition and behavior analysis of Sundyne DPF-103A pump in Dina Petrokemija d.d., Omišalj, Croatia2008
311.        Vibrational behavior analysis of machines in Energetika plant in Nafta petrochem d.o.o. Lendava, Slovenija during steady state on 19.02.2008.2008
312.        Cooling tower fan balancing in Messer Croatia plin, Kutina, Croatia2008
313.        Vibrational behavior analysis and on-site balancing of a fan in KB Dubrava, Zagreb, Croatia2008
314.        Vibrational condition analysis of cooling tower fans, motors for feedwater pumps and turbogenerator gearbox of Energetika plant in Nafta petrochem d.o.o. Lendava, Slovenija during steady state on 06.03.2008. 2008
315.        Vibrational condition and behavior and process state analysis of compressor 313-K-002 on Platforming 2 Plant in INA-Refinery Rijeka, Craotia during tests on 13.03.2008.2008
316.        On site balancing of TESAB 1012-4 crusher in Šumber quarry, Croatia2008
317.        Vibrational condition and behavior analysis of 125 MW turbogenerator in Power plant Plomin, Croatia during unloading and shut-down on 26.02.2008.2008
318.        Cooling tower fan balancing in Messer Croatia plin, Kutina, Croatia2008
319.        Vibrational condition and behavior analysis of wet gas compressor 323-GC-1 on FCC plant in Oil rafinery Rijeka during startup and steady state from 10. till 11.04. 2008. 2008
320.        Vibrational condition and behavior analysis of wet gas compressor 323-GC-1 on FCC plant in INA-Refinery Rijeka, Croatia during startup and steady state operation from 14. till 17. 04. 2008. 2008
321.        Vibrational condition and behavior and process state (thermodynamical) analysis of compressor 313-K-002 on Platforming 2 plant in INA-Refinery Rijeka, Croatia after overhaul and high vibration amplitudes problem elimination during April 2008.2008
322.        Vibrational condition and behavior analysis of 125 MW turbogenerator in Power Plant Plomin, Croatia during start-up, loading and full load operation2008
323.        Vibrational condition and behavior analysis of 200 MW turbogenerator (Unit 4) in Power Plant Tuzla, B&H, during steady state and shut-down on 05.06.2008.2008
324.        Vibrational condition analysis of climatization fans York in Selk d.d. Kutina, Croatia2008
325.        Analysis of vibrational condition and behavior of GT1 turbogenerator (gas turbine+gear box+generator) on 27.06.2008. in INA Naftaplin d.d., Ethan Plant, Ivanić Grad, Croatia2008
326.        Vibrational condition analysis of Jung grinder no. 3 on Siemens line in Selk d.d. Kutina, Croatia during idle operation and gridning after motor replacement2008
327.        On site balancing of TESAB 1012-4 crusher in Šumber quarry, Croatia2008
328.        Laser flattness measurement and vibration state analysis of grinders Jung 2 and 3 on line Siemens in Selk d.d. Kutina, Croatia during idle operation and grinding2008
329.        Vibrational condition and behavior analysis of 5 MW turbogenerator in Radeče papir d.d, Slovenia during steady state operation, shut-downs and start-ups on 08.08.2008.2008
330.        Vibrational condition and behavior analysis of Hyper compressor BC-101 on Polyethylen Plant in Dina Petrokemija d.d. Omišalj, Croatia2008
331.        Laser flattness measurement and vibration state analysis of grinders Jung 1 and 2 on line Siemens in Selk d.d. Kutina, Croatia during idle operation and grinding2008
332.        Vibrational condition and behavior analysis of pump no. 2 branch no. 2 in boiler room and cooling pumpe EFG-2 in KB Dubrava, Zagreb, Croatia2008
333.        Vibrational condition and behavior analysis of gas motor and recip compressor IR KVR A inEthan Plant, Ivanić Grad, Croatia during steady state and speed variation on 14.07.2008.2008
334.        Vibrational condition analysis of two pumps in KB Dubrava, Zagreb, Croatia2008
335.        Vibrational condition and behavior analysis and on-site balancing of crusher in quarry Sv. Mikula, Coratia2008
336.        Vibrational behavior analysis of crack gas compressor on Ethylen Plant in HIP Petrohemija Pančevo, Serbia during steady state operation, unloading and shut-down for overhaul2008
337.        Vibrational behavior analysis of Prophylen cooling compressor on Ethylen Plant in HIP Petrohemija Pančevo, Serbia during steady state operation, unloading and shut-down for overhaul2008
338.        Vibrational behavior analysis of ethylen compressor on Ethylen Plant in HIP Petrohemija Pančevo, Serbia during steady state operation, unloading and shut-down for overhaul2008
339.        Vibrational behavior analysis of prophylen cooling compressor on Ethylen Plant in HIP Petrohemija Pančevo, Serbia during start-up,loading and steady state operation after overhaul2008
340.        Vibrational behavior analysis of ethylen compressor on Ethylen Plant in HIP Petrohemija Pančevo, Serbia during start-up,loading and steady state operation after overhaul2008
341.        Vibrational behavior analysis of crack gas compressor on Ethylen Plant in HIP Petrohemija Pančevo, Serbia during start-up,loading and steady state operation after overhaul2008
342.        Thermodynamic evaluation of GT-201 turbine and compressors G-201+G-202 of synthesis compressor train on Methanol plant, Nafte-petrochem Lendava, Slovenia2008
343.        Very high vibration amplitude analysis on a 12 MW turbogenerator in Refinery Bosanski Brod, R. Srpska, B&H2008
344.        Vibrational condition and behavior analysis of 30 MW turbogenerator in INA- Refinery Sisak, Croatia after middle bearing block modification2009
345.        Vibrational condition and behavior analysis of turbogenerator GT-1 (gas turbine,+gear box+generator) in Ethan Plant, Ivanić Grad, Croatia2009
346.        Vibrational condition and behavior analysis of 30 MW turbogenerator in INA- Refinery Sisak during tests after mechanical checks with emphasis on middle bearing block2009
347.        Vibrational condition r analysis of gridner Jung 1 on Siemens line after repairs in Selk d.d. Kutina, Croatia2009
348.        Vibrational condition analysis of climate fans York AHU-1 i AHU-2 in Selk d.d. Kutina, Croatia after repairs2009
349.        Vibrational condition analysis and balancing of funrace fan in Tang d.d. Nova Gradiška, Croatia2009
350.        Vibrational condition and behavior analysis of electromotors for mills and fans in Power Plant Ugljevik, R. Srpska, B&H2009
351.        Vibrational condition analysis of screw compressor 375-K-301 on PSA plant in INA-Refinery Rijeka, Croatia2009
352.        Vibrational condition and behavior analysis of new generator for Ethan Plant during tests in Končar-Generatori i motori d.d, Croatia2009
353.        Vibrational condition and behavior analysis of blower 323-FC-1 (turbine+blower) of FCC Plant in INA-Refinery Rijeka during start-ups, shut-downs and steady state operation2009
354.        Vibrational condition and behavior analysis of of wet gas compressr 323-GC-1 of FCC Plant in INA-Refinery Rijeka during start-ups, shut-downs and steady state operation2009
355.        Vibrational condition analysis of grinder Jung 4 on Siemens line during grinding before and after dress role replacement in Selk d.d. Kutina, Croatia2009
356.        Vibrational condition and behavior analysis of 300 MW turbogenerator (steam turbine+generator) in Power Plant Ugljevik during steady state and unplanned shut-down before overhaul in 2009, R. Srpska, B&H2009
357.        Vibrational condition and behavior analysis of pumping stations machines in PP Ugljevik, R. Srpska, BiH2009
358.        Vibrational condition and behavior analysis of compressor train 313-K-002 machines of Platforming 2 Plant before overhaul, INA-Refinery Rijeka, Croatia2009
359.        Vibrational condition and behavior analysis of 125 MW turbogenerator (turbine+generator) during steady state, unloading and shut-down before overhaul in 2009, Power Plant Plomin, Croatia2009
360.        Vibrational condition and behavior analysis of 125 MW turbogenerator during start-up, generator protection testing, loading and steady state operation after overhaul in 2009, Power Plant Plomin, Croatia2009
361.        Vibrational condition and behavior analysis of 125 MW turbogenerator during start-ups, synchronizations, loading and steady state after overhaul in 03.09.2009, Power Plant Plomin, Croatia2009
362.        Vibrational condition and behavior analysis of drying fan during balancing, Dukat d.d, Plant Sirela, Bjelovar, Croatia2009
363.        Vibrational condition and behavior analysis of Platforming Plant-2 turbotrain (turbine+compressor) 313-K-002 after overhaul, INA-Refinery Rijeka, Croatia2009
364.        Analysis of ibrational condition and behavior of left and right exhaust gas fans of Unit 5 in Power Plant Kakanj, B&H2009
365.        Vibrational condition and behavior analysis of 120 MW turbogenerator during steady state operation, unloading and shut-down before overhaul in 2009, TE TO Zagreb, Croatia2009
366.        Analysis of vibrational condition and behavior of 120 MW turbogenerator during start-up, generator protection testing, loading and steady state operation after overhaul in 2009, TE TO Zagreb, Croatia2009
367.        Vibrational condition and behavior analysis of FCC Plant blower 327 KA-001 machines after turbine and compressor overhaul in INA-Refinery Rijeka, Croatia2010
368.        Analysis of vibration condition and behavior analysis of 30 MW turbogenerator in INA-Refinery Sisak Power plant with on-site balancing, Croatia2010
369.        Analysis of vibrational condition and behavior of 42 MW turbine and generator (Unit 3) in TE-TOL Ljubljana, Slovenia2010
370.        Vibrational condition and behavior analysis of grinder Jung 3 in SELK Kutina, Croatia2010
371.        On-site balancing of fan with vibration anlalysis in TANG, Nova Gradiška, Croatia2010
372.        Vibrational condition and behavior analysis of 210 MW turbogenerato (Unit 7) during start-up, steady state operation and shut-down before overhaul, Power Plant Kakanj, B&H2010
373.        Vibrational condition and behavior analysis of crack gas compressor CT+C-201 on Ethylen plant, DIOKI d.d. Zagreb, Croatia2010
374.        Analysis of vibrational condition and behavior of 1,9 MW turbogenerator Siemens in Novoles d.d. Straža, Slovenia before major overhaul of turbine and gearbox in August 2010. 2010
375.        Analysis of vibrational condition and behavior of 1,9 MW turbogenerator Siemens in Novoles d.d. Straža, Slovenia after major overhaul of turbine and gearbox in August 2010.
376.        Vibrational condition and behavior analysis of 30 MW turbogenerator during startup, trial run, loading and steady state operation, INA_Refinery Sisak, Croatia2010
377.        Analysis of vibrational condition and behavior 210 MW turbogenerator (Unit 7) during start-ups, steady state operations and shut-downs after overhaul, Power Plant Kakanj, B&H2010
378.        Vibrational condition and behavior analysis of machines in KTE Jertovec, Croatia before overhaul in 2010. 2010
379.        Vibrational condition and behavior analysis of 12 MW turbogenerator in EL-TO Zagreb, Croatia during startups, synchronization, tests, shutdowns, loading and steady state operation after overhaul2010
380.        Vibrational condition and behavior analysis of 30 MW turbogenerator in EL-TO Zagreb, Croatia during startups, synchronization, tests, shutdowns, loading and steady state operation after overhaul2010
381.        Vibrational condition and behavior analysis of screw compressor 375-K-301 on PSA plant in INA-Refinery Rijeka, Croatia during tests in August and September 2010. 2010
382.        On-site balancing of 4 in KTE Jertovec, Croatia2010
383.        Vibrational condition and behavior analysis of air compressor no. 2 in compressor station in U.S. Steel Smederevo, Serbia2010
384.        Vibrational condition and behavior analysis of air compressor no. 3 in compressor station in U.S. Steel Smederevo, Serbia2010
385.        Analysis ofvibrational condition and behavior and analysis of governing system of 45 MW turbogenerator during tests on 29. and 30. 12. 2010, TE-TO Osijek, Croatia2010
386.        Analysis of FCC Plant turbotrain 327-K-001 high vibration problem analysis, INA-Refinery Rijeka, Croatia2011
387.        Speed oscillation problem analysis of FCC Plant compressor 328-K-001, INA-Refinery Rijeka, Croatia2011
388.        Analysis of high vibration amplitudes problem on 376 P 002B pump, Hydrocracker Plant, Oil rafinery Rijeka, Croatia2011
389.        Analysis of problem with governing system of 20 MW steam turbine in INA-Refinery Rijeka, Croatia during tests in January 2011.2011
390.        Vibrational condition and behavior analysis of machines (two 31,5 MW gas turbogenerator, 12,5 MW steam turbogenerator, 3 feed water pumps trains, 4 cooling water pumps trains, 2 fans) in KTE Jertovec, Croatia after overhaul in 2010/2011.2011
391.        Analysis of vibrational condition and behavior of pilot plant turbogenerator ĐĐ-ENITEH 500, Đuro Đaković Elektromont, Slavonski Brod, Croatia2011
392.        Balancing of fans of pilot plant ĐĐ-ENITEH 500, Đuro Đaković Elektromont, Slavonski Brod, Croatia2011
393.        Vibrational condition and behavior analysis of oxygen compressr KTK-2, Messer Tehnogas AD, Smederevo, Serbia2011
394.        Vibrational condition and behavior analysis of rotating and reciprocating machines in Messer Kutina, Croatia during steady state opeartion on 18.04.2011.2011
395.        Vibrational condition and behavior analysis and analysis of governing system of 45 MW turbogenerator during tests in June 2011, TETO Osijek, Croatia2011
396.        Vibrational condition and behavior analysis of TG 2 turbogenerator in KTE Jertovec, Croatia during start-up, loading and steady state operation on 18.07.2011. 2011
397.        Vibrational condition and behavior analysis of 348 MW turbogenerator (Unit 6) in Power Plant Nikola Tesla A, Obrenovac, Serbia during startup on 02.12.2011. and steady state operation from 2nd till 9th December 20112011
398.        Analysis of vibration condition and behavior of 75 MW steam turbine and generator (Unit 3) in Power Plant Šoštanj, Slovenia2012
399.        Analysis of vibration condition and behavior of 210 MW steam turbine and generator (Unit 2) before overhaul in Power Plant Plomin, Croatia2012
400.        Analysis of vibration condition and behavior of 210 MW steam turbine and generator (Unit 2) after overhaul in Power Plant Plomin, Croatia2012
401.        Vibrational condition and behavior analysis of 75 MW steam turbine and generator (Unit 3) after rotor repairs in Power Plant Šoštanj, Slovenia2012
402.        Vibration condition and behavior analysis of Air Blower 379-KA-101, air suply line, air heater 379-E-102 and furnace 379-H (furnace and burners) with furnace and thermoacoustic analysis in SRU plant in INA-Refinery Rijeka, Croatia2012
403.        Vibration condition and behavior analysis of 115 MW gas turbine, gearbox and generator (Unit 4) before overhaul in Power Plant Brestanica, Slovenia2012
404.        Vibration condition and behavior analysis of 115 MW gas turbine, gearbox and generator (Unit 4) after overhaul in Power Plant Brestanica, Slovenia2012
405.        Analysis of vibration condition and behavior of GB-5001 (electromotor, gearbox and compressor) on the new Hydrocracking Plant during commisioning in NIS-Refinery Pančevo, Serbia2012
406.        Analysis of vibration condition and behavior of GB-2453 B (booster blower) on the new Hydrocracking Plant during commisioning in NIS-Refinery Pančevo, Serbia2012
407.        Analysis of vibration condition and behavior of R-1 turbotrain (crack gas compressor) during startup, loading and steady state operation after overhaul, Ethylen Plant in HIP Petrohemija Pančevo, Serbia2012
408.        Analysis of vibration condition and behavior of R-2 turbotrain during startup, loading and steady state operation after overhaul, Ethylen Plant in HIP Petrohemija Pančevo, Serbia2012
409.        Analysis of vibration condition and behavior of R-3 turbotrain during startup, loading and steady state operation after overhaul, Ethylen Plant in HIP Petrohemija Pančevo, Serbia2012
410.        Vibration condition and behavior analysis of buthadien screw compressor train CM-1140 (electromotor+gearbox+compressor) in FSK Elemir (Synthetic Rubber Plant), Serbia2013
411.        Vibration condition and behavior analysis of 39 fans and electromotors, Underground Gas Storage PSO Okoli, Croatia2013
412.        Analysis of vibration condition and behavior of FCC Plant's turbotrain GB-2301, from 18.11.2012. to 10.06.2013. (steady state operation, shudowns and startups) , NIS-Refinery Pančevo, Serbia2013
413.        Analysis of vibration condition and behavior of FCC Plant's turbotrain GB-2501, from 18.11.2012. to 10.06.2013. (steady state operation, shudowns and startups), NIS-Refinery Pančevo, Serbia2013
414.        Analysis of vibration condition and behavior of Alkyne Plant's turbotrain GB-2601, from 18.11.2012. to 10.06.2013. (steady state operation, shudowns and startups), NIS-Refinery Pančevo, Serbia2013
415.        Analysis of thermodynamic and operation condition and behavior of FCC Plant's turbotrain GB 2301, NIS-Refinery Pančevo, Serbia2013
416.        Analysis of thermodynamic and operation condition and behavior of FCC Plant's turbotrain GB 2501, NIS-Refinery Pančevo, Serbia2013
417.        Analysis of thermodynamic and operation condition and behavior of Alkyne Plant's turbotrain GB 2601, NIS-Refinery Pančevo, Serbia2013
418.        Study on replacement of FCC and Alkyne Plants' steam turbines with electromotors, NIS-Refinery Pančevo, Serbia2013
419.        Vibration condition analysis of main and auxiliary machinery (two 31,5 MW gas turbogenerator, 12, MW steam turbogenerator, 3 feed water pumps trains, 4 cooling water pumps trains, 2 fans), KTE Jertovec, Croatia2013
420.        Vibration condition and behavior analysis of Ethylen Plant's turbotrain R-1 in HIP Petrohemija Pančevo, Serbia2013
421.        Vibration condition and behavior analysis of steam turbine and compressor (Nuovo Pignone) 327-KA-001 on FCC Plant after the major overhaul, INA-Refinery Rijeka, Croatia2013
422.        Vibration behavior analysis of steam turbine and compressor (Nuovo Pignone) 313-K-002 on Platforming 2 Plant after the major overhaul, INA-Refinery Rijeka, Croatia2013
423.        Vibration condition analysis of fan, Plant Sirela, Dukat d.d., Croatia2013
424.        Vibrational condition and behavior analysis of rotary screw compressor train HIP- Petrohemija Pančevo, Serbia2014
425.        Vibration condition and behavior analysis of turbotrain PT5116 (1,2 MW steam turbine +gear box +pump), KP4 Plant, INA-Refinery Sisak, Croatia2014
426.        Vibration condition analysis of 4 Water Pumps (electro motor and pump) in Moslavina d.o.o., Kutina, Croatia2014
427.        Vibration condition analysis of 12 fans (electro motor+ belt drive+ fan) in Selk d.d. Kutina, Croatia2014
428.        Analysis of the air compressors 379-K-101 A i B operation and vibrational condition with special stress on antisurge system operation, INA-Refinery Rijeka, Croatia2014
429.        Vibration condition and behavior analysis of Fan, Rockwool Adriatic d.o.o., Croatia2014
430.        Analysis of operation and configuration of the governing systems on three turbotrains R-1, R-2 and R-3 (De Laval 14,34 MW, 11,76 MW and 1,73 MW), Ethylene Plan HIP-petrokhemija Pančevo, Serbia2014
431.        Vibrational condition and behavior analysis of rotary screw compressor trains NH3 and CO2 in Messer Croatia Gas, Croatia2014
432.        Vibrational condition analysis of Pump (P-7402: Electromotor+ Gear Box+ Pump) in JANAF (crude oil transportation and storage of oil and oil products), Croatia 2014
433.        Vibrational condition analysis of rotary screw compressor trains NH3 and CO2 in Messer Croatia Gas, Croatia2015
434.        Vibrational condition and behavior analysis of Fan (electric motor+ belt drive +fan) in the dairy industry Dukat Sirela in Bjelovar, Croatia2015
435.        Vibrational condition and behavior analysis of oil transport pump P-2603 (electric motor, Voith transmission with a hydrodynamic coupling and pump) in JANAF (crude oil transportation and storage of oil and oil products), Croatia2015
436.        Vibrational condition and behavior analysis of oil transport pump P-7106 (electric motor, Voith transmission with a hydrodynamic coupling and pump) in JANAF (crude oil transportation and storage of oil and oil products), Croatia2015
437.        Vibrational condition and behavior analysis of Pump RCP (reactor cooling pump train) 1, Nuclear Power Plant Krško, Slovenia2015
438.        Analysis of reasons of wet gas compressor 328-K-001 forced shutdowns in FCC Plant INA-Refinery Rijeka during startups in February 2015, Croatia2015
439.        Analysis of reasons of wet gas compressor 328-K-001 forced shutdowns in FCC Plant INA-Refinery Rijeka in February – April 2015,, Croatia2015
440.        Analysis of vibration condition and behavior of Platforming Plant-2 turbotrain 313-KA-002 in INA-Refinery Rijeka, Croatia, after disturbances caused by Plant's fire2015
441.        Analysis of the high vibraton problem of Unit 7 indiced draft fan, Thermal Power Plant Kakanj, Bosnia and Hercegovina2015
442.        Vibration condition and behavior analysis of fline of fans (electro motor+ belt drive+ fan) in Selk d.d. Kutina, Croatia2016
443.        Vibration behavior analysis of machine WAC715 SCALAR (Wendt GmbH) with a stress on efficency increasing using new components of the machine in Selk d.d. (EPCOS) Kutina, Croatia2016
444.        Vibration condition and behavior analysis of Ammonia Plant's turbotrain TC+SM+C 21101 (steam turbine, LP compressor, gear box and HP compressor) during startup, loading and steady state operation after overhaul, Petrokemija Kutina, Croatia2016
445.        Analysis of vibration condition and behavior of Ammonia Plant's TC+C 21105 turbotrain (steam turbine, LP compressor and HP compressor) during startup, loading and steady state operation after overhaul, Petrokemija Kutina, Croatia2016
446.        Analysis of vibration condition and behavior of Urea Plant's turbotrain TC+C+SM 22112 (steam turbine, LP compressor, gear box and HP compressor) during startup, loading and steady state operation after overhaul, Petrokemija Kutina, Croatia2016
447.        Analysis of vibration condition and behavior of 20 MW turbogenerator during startup and idle operation without synchronization after major overhaul in Energana II Power Plant, INA-Refinery Rijeka, Croatia2016
448.        Analysis of vibration condition and behavior of 20 MW turbogenerator during startup,idle operation,synchronization, loading and steady state operation after major overhaul in Energana II Power Plant, INA-Refinery Rijeka, Croatia2016
449.        Vibrational condition and behavior analysis of oil transportation pump P-7106 (electric motor, Voith transmission with a hydrodynamic coupling and pump) in JANAF (crude oil transportation and storage of oil and oil products), Croatia2016
450.        Analysis of FCC Plant's GB 2301 turbotrain possibility to work bellow minimal governing speed, NIS-Refinery Pančevo, Serbia2016
451.        Vibrational condition and behavior analysis of off-line rotating equipment (few hundreds ofelectromotors, pumps, fans,...) in INA-Refinery Rijeka, Croatia2016
452.        Vibrational condition and behavior analysis in April of off-line rotating equipment (few hundreds ofelectromotors, pumps, fans,...) in INA-Refinery Rijeka, Croatia2017
453.        Analysis of 20 MW turbogenerator (341-TA-021) cause of forced and unplanned shutdown and vibration condition and behavior, Power Plant-2, INA-Refinery Rijeka, Croatia2017
454.        Analysis of 20 MW turbogenerator (341-TA-021) vibration condition and behavior during startup, excessive overspeed operation and shutdown, Power Plant-2, INA-Refinery Rijeka, Croatia2017
455.        Complex analysis of 3 MW steam turbine rear bearing high vibration problem with evaluation of steam turbine, gear box and generator condition in BE-TO (Biomass Power Plant) Osijek, Croatia2017
456.        Vibrational condition and behavior analysis in Julyl of off-line rotating equipment (few hundreds ofelectromotors, pumps, fans,...) in INA-Refinery Rijeka, Croatia2017
457.        Analysis of 500 kW turbogenerator gear box very high shaft vibration amplitudes in Thermal Power Plant Miljöteknik Energi AB, Ronneby, Sweden 2017
458.        Vibrational condition and behavior analysis in October of off-line rotating equipment (few hundreds ofelectromotors, pumps, fans,...) in INA-Refinery Rijeka, Croatia2017
459.        Analysis 3 MW steam turbine turbogenerator (steam turbine, gear box and generator) vibration condition and behavior after stiffness modification, BE-TO (Biomass Power Plant), Osijek, Croatia
460.        Vibrational behavior analysis of oil transport pump (electric motor 2,5 MW, Voith transmission with hydrodynamic coupling and pump) in JANAF (crude oil transportation and storage of oil and oil products), Croatia2017
461.        Vibrational behavior analysis of oil transport pump (electric motor 2,0 MW and pump) in JANAF (crude oil transportation and storage of oil and oil products), Croatia2017
462.        Vibrational condition and behavior analysis of Francis Hydroturbine 155 MW in Shiroro/Abuja, Nigeria2017
463.        Analysis of MK-5 reciprocating compressor and electromotor vibration and process (thermodinamical) condition and behavior during commissioning and operation, PSP Okoli (Underground gas storage), Croatia2017
464.        Vibrational condition and behavior analysis of oil transport pump (electric motor 3,3 MW, Voith transmission with hydrodynamic coupling and pump) in August after pump major overhaul (crude oil transportation and storage of oil and oil products), JANAF Omišalje, Croatia2017
465.        Analysis of vibiration condition and behavior of 45 MW turbogenerator (Unit 3) in TE-TO Ljubljana, Slovenia during startup, loading and steady state operation on 09.11.2017. after overhaul2017
466.        Vibrational condition and behavior analysis of oil transport pump (electric motor 3,3 MW, Voith transmission with hydrodynamic coupling and pump) in September after mechanical corrective works (crude oil transportation and storage of oil and oil products), JANAF Omišalje, Croatia2017
467.        Vibrational condition and behavior analysis of induced draft fanof Unit 7 (210 MW), Thermal Power Plant Kakanj, Bosnia and Hercegovina2017
468.        Analysis of MK-5 reciprocating compressor and electromotor vibration and process (thermodinamical) condition and behavior during commissioning and operatio, PSP Okoli (Underground gas storage), Croatia2017
469.        Analysis of MK-5 reciprocating compressor and electromotor vibration and process (thermodinamical) condition and behavior during normal operation, PSP Okoli (Underground gas storage), Croatia 2017
470.        Analysis of Termoelektrarna Brestanica, Slovenia GT 26 Turbogenerator Machines (gas turbine+gear box+generator) vibrational behavior and condition during Testing in March 20182018
471.        Analysis of the Ammonia Plant'a air compressor turbotrain gear box SM 21101 high vibration problem and damage, Petrokemija kutina, Croatia2018
472.        Analysis of the Ammonia Plant'a air compressor turbotrain gear box SM 21101 vibiration condition and behavior before and after repair, Petrokemija kutina, Croatia2018
473.        Analysis of the Ammonia Plant'a air compressor turbotrain gear box SM 21101 casing vibration condition and behavior after repair, Petrokemija Kutina, Croatia2018
474.        Analysis of 730 MW turbogenerator vibrational condition and behavior before exciter replacement, Nuclear Power Plant Krško, Slovenia2018
475.        Analysis of thermodynamic and operational condition and behavior of FCC Plant's wet gas compressor (GB 2501) with recomendations for corrective actions and assistence in execution, NIS-Refinery Pančevo, Serbia2018
476.        Analysis of vibration condition and behavior of Ammonia Plant's turbotrain TC+SM+C 21101 (steam turbine, LP compressor, gear box and HP compressor) before overhaul, Petrokemija Kutina, Croatia2018
477.        Analysis of vibration condition and behavior of Ammonia Plant's turbotrain (natural gas compressor) TC+ C 21102 (steam turbine+compressor) before overhaul, Petrokemija Kutina, Croatia2018
478.        Analysis of vibration condition and behavior of Ammonia Plant's turbotrain (synthesis gas compressor) TC+C 21103 (steam turbine, LP compressor and HP compressor) before overhaul, Petrokemija Kutina, Croatia2018
479.        Vibration condition and behavior analysis of Ammonia Plant's turbotrain (ammonia refrigerant compressor) TC 21105 (steam turbine, LP compressor and HP compressor) before overhaul, Petrokemija Kutina, Croatia2018
480.        Vibration condition and behavior analysis of Urea Plant's turbotrain TC+SM+C 22112 (steam turbine, LP compressor, gear box and HP compressor) before overhaul, Petrokemija Kutina, Croatia2018
481.        Vibration condition and state analysis of newly installed Termomeccanica Pompe in Janaf, Croatia2018
482.        Analysis of vibration condition and behavior of train P-7107 (electromotor, Voith coupling/gearbox,pump) in Terminal Omišalj, Janaf, Croatia after electromotor replacement and Voith coupling overhaul2018
483.        Analysis of vibration condition of conveyers' drivers CP-101 CV-103 and CV-104 in Port Ploče, Croatia2018
484.        Vibration condition and behavior analysis of Ammonia Plant's turbotrain (air compressor) TC+SM+C 21101 (steam turbine, LP compressor, gear box and HP compressor) during startup, loading and steady state operation after overhaul, Petrokemija Kutina, Croatia2018
485.        Vibration condition and behavior analysis of Ammonia Plant's turbotrain (natural gas compressor) TC+ C 21102 (steam turbine+compressor) during startup, loading and steady state operation after overhaul, Petrokemija Kutina, Croatia2018
486.        Vibration condition and behavior analysis of Ammonia Plant's turbotrain (synthesis gas compressor) TC+C 21103 (steam turbine, LP compressor and HP compressor) during startup, loading and steady state operation after overhaul, Petrokemija Kutina, Croatia2018
487.        Vibration condition and behavior analysis of Ammonia Plant's turbotrain (ammonia refrigerant compressor) TC 21105 (steam turbine, LP compressor and HP compressor) during startup, loading and steady state operation after overhaul, Petrokemija Kutina, Croatia2018
488.        Vibration condition and behavior analysis of Urea Plant's turbotrain TC+SM+C 22112 (steam turbine, LP compressor, gear box and HP compressor) during startup, loading and steady state operation after overhaul, Petrokemija Kutina, Croatia2018
489.        Analysis of vibrational condition and behavior of turbotrain TC+SR 52101 after overhaul, PEPI Plant, Petrokemija Kutina, Croatia2018
490.        Analysis of high vibration problem of air compressor in Oxygen Plant, ABS d.o.o. Sisak, Croatia2018
491.        Analysis of vibration and process (thermodynami) condition and behavior of MK-1 train (gas engine+reciprocating compresor) during commissioning, PSP Okoli (Underground gas Storage), Croatia2018
492.        Analysis of vibration and process (thermodynami) condition and behavior of MK-2 train (gas engine+reciprocating compresor) during commissioning, PSP Okoli (Underground gas Storage), Croatia2018
493.        Analysis of vibration and process (thermodynami) condition and behavior of MK-1 train (gas engine+reciprocating compresor) during normal operation, PSP Okoli (Underground gas Storage), Croatia2018
494.        Analysis of vibration and process (thermodynami) condition and behavior of MK-2 train (gas engine+reciprocating compresor) during normal operation, PSP Okoli (Underground gas Storage), Croatia2018
495.        Complex analysis of the longlasting problem with Urea Plant's HP compressor high vibration and operational problems, as well as problem with shaft currents, Petrokemija Kutina, Croatia2018
496.        Complex analysis of high shaft vibration amplitudes of TA 3's 16 MW generator during startups and operation after overhaul, DS Smith Belišće Croatia d.o.o., Croatia2018
497.        Analysis of vibration condition of a new Turboden turbogeneratoru on a geothermal plan Velika Ciglena during comissioning testing on 21.01.2019.2019
498.        Complex analysis of high shaft vibration amplitudes of TA 2 turbogenerator after overhaul, DS Smith Belišće Croatia d.o.o., Croatia2019
499.        Vibration analysis of new pumps delivered by Termomeccanica Pompe on crude oil terminal Omišalj, Janaf2019
500.        Vibration analysis of GB 4301 turbotrain in Oil Refinery Pančevo, Serbia2019
501.        Crude oil pump P-7107 on terminal Omišalj after motor replacemetn, Janaf, Hrvatska2019
502.        Vibration analysis of hydrogen compressor GB-5001, Hydrogen plant, Oil Refinery Pančevo, Srbija2019
503.        Vibration analysys of compressor trains 327-K-001, 376-K-001 and 313-K-002 after overhaul, Oil Refinery Rijeka2019
504.        Vibration analysis of hydropowerplant turbogenerator in MHE Melje, Slovenia2019
505.        Vibration analysis of blower C for fluidized bed in Powerplant Stanari, BiH2019
506.        Vibration analysis of CNC machines Jung J1 and J3 in Selk d.d. Kutina2020
507.        Vibration analysis of new pump 6320 delivered by Termomeccanica Pompe on crude oil terminal Omišalj after redesign, Janaf2020
508.        Building elevator drive analyisis in Zagreb2020
509.        Complex analysis of high shaft vibration amplitudes of TA 2 turbogenerator, DS Smith Belišće Croatia d.o.o., Croatia2020
Remarks:

1. These references of diagnostic works states only works that were carried by Turbomehanika experts as Turbomehanika employees. Most of the analysis required to analyse more machines since the entire trains were analysed.

2. Before 1994. our experts carried out few hundreds analysis on machines in Petrokemija Kutina, Croatia (that had first Bently Nevada computerized diagnostics system in Europe in early 1980's that monitored 6 turbotrains) where they used to do predictive maintenance by using both on-line and periodic (ADRE) measurement.

3. Turbomehanika is authorized partner and distributor of General Electric Company for Bently Nevada products. Bently Nevada is world leading manufacturer of equipment for monitoring, protection and diagnostics of machinery.

4. Turbomehanika's experts use for DAQ and diagnostics the following equipment:

a. Portable data collector 408 SXP (24 channels + digital recorder)
b. Portable data collectors Bently Nevada DAIU 208-P (16 channels)
c. Mini rack able to collect data from up to 60 channels
e. Software ADRE SXP
e. Software ADRE for Windows Bently Nevada
f. Software System 1 Bently Nevada
g. Software for balancing Turbobalans –Turbomehanika
h. Software for balancing Bently balans
i. Rotor-bearing system modeling software DYROBES

5. Turbomehanika installed a significant number of systems for monitoring, protection and diagnostics of machinery